Tag Archives: shipwrights

Port Townsend: Haven Boatworks expands their wake

The team of shipwrights at Haven work on all types of boats, from upkeep on commercial fishing boats to repairs on yachts and wooden sail boats. At any given time, they may have more than a dozen boats in the yard. They stay busy from mostly word-of-mouth referrals from delighted customers. Blaise Holly says that whether commercial or private, captains have a relationship with their vessels. For commercial owners a boat is their livelihood where they spend the bulk of their time. Every year or two most boats need some type of routine maintenance, like cleaning off buildup of seaweed and barnacles from the hull photos, >click to read< 15:01

An inside look at Seattle’s fishing industry

This unique network of professionals, ranging from shipbuilders to pipe fitters to marine electricians and more helps fuel the local economy and offers a range of career options. When fishing fleets, based at the Port of Seattle’s Terminal 91 on the Seattle waterfront in Interbay, return laden with their catch, a single ship might carry fillet blocks, loin blocks, surimi, roe, fish meal and fish oil, says Kelli Goodwin, senior manager, Maritime Operations at the Port of Seattle. These products are separated and loaded into export carriers, on-site freezer cold storage, rail cars (for fish oil) or long-haul trucks for domestic distribution. “The next fish stick or fish fillet sandwich you eat, likely was caught by a vessel that calls Seattle home,” >click to read< 14:05

Feds fund new work tent for local shipwright

Astoria based WCT Marine & Construction, one of the few remaining shipwrights in the region, has secured a $573,000 federal grant to build a self-contained outside work area at North Tongue Point. The U.S. Maritime Administration provided the grant through its Small Shipyard Grant Program. WCT will match $191,000. WCT requested a 200-foot-long, 60-foot-wide tent where employees can work on tugs, barges and commercial fishing boats out of the wind and rain, speeding up the turnaround on projects. Under the tent will be a filtered drainage to catch byproducts from welding, painting and other vessel work. >click to read< 18:16