Tag Archives: McDowell Group report

A Time to Build & Refit

The aging Pacific Northwest fishing fleet is either undergoing or about to undergo a long-overdo upgrade, judging by a major economic report commissioned by the Port of Seattle. Fisheries managers, seafood suppliers, yards and the supply chain all hope an accompanying surge in ship finance “lifts all boats”. For now, the newbuild count is growing apace, slowed just a bit by owners opting for major retrofits amid rich fish harvests. This fisheries upsurge comes with some rising stars of ship design-and-build for vessels set to ply the Bering and Beaufort seas. The ’70s were the heyday of boatbuilding — half of the current U.S. Pacific Northwest’s 400-strong fleet of vessels over 58 feet were built when sideburns were mandatory. The fleet’s boats are so well-maintained, most of them, that they’re still candidates for retrofits of engines, holds, electrical systems and deck machinery.  Read the story here 08:14

New North Pacific fleet would cost $11.6B

Rejuvenating Alaska’s large vessel fishing fleet could be nearly an $11 billion boon for Outside shipyards, according to a new McDowell Group report. The Alaska-based research firm pegged $11.3 billion as the cost to completely replace the 414 fishing and processing vessels longer than 58 feet that participate in North Pacific fisheries off the coast of Alaska in a study commissioned by the Port of Seattle and the Washington Maritime Federation. Regulations require boats in Alaska’s salmon fisheries to be less than 58 feet, which makes that length the general delineator between smaller boats focused on near shore fisheries and larger vessels that fish and process catch in federal waters at least three miles offshore. Additionally, most of the more than 5,000 smaller commercial fishing boats that operate in Alaska homeport in the state and nearly all of the larger vessels in federal fisheries have Puget Sound addresses for a host of reasons. While the $11.3 billion baseline figure includes the cost to eventually replace a dozen vessels among the 414 built since they year 2000, according to McDowell Group the fleet averages 40 years old and 87 percent of the vessels were built before 1990. Read the article here 09:14