New Russian Crab Fleet Takes Shape
Following the delivery of Rus, Pella is making progress on two more crabbers to the same design, ordered for Sakhalin-based company Ostrovnoy-Krab. In the Far East, the Nakhodka Ship Repair Yard has contracted to build eight crabbers to a design developed by Damen – six for Antey and two for the Pacific Fishing Company (TRK). The first three of this series of crabbers designed to land fresh catches are scheduled to be in the water before the end of this year, with the series as a whole to be completed between 2021 and 2024. >photo’s, click to read< 16:27
Leave a Reply