Tag Archives: needs millions in upgrades

Ballard Locks face millions in upgrades or risk failure

The region’s economy could be at risk, as well as its environment and even highways if one aging chokepoint is not addressed – the Ballard Locks. Needed work on the 100-year-old facility could take between $30-60 million and between 6-10 years to complete. In the meantime, work on items such as the emergency closure system await updates. “If the locks were to fail in an open position, Lake Washington could drain by a pretty dramatic amount and quickly,” said Charles Costanzo with the American Waterways Operators,,, “You have critical infrastructure like the 520 Bridge and the I-90 Bridge; you have a floating bridge that could potentially no longer be floating. That would seriously compromise the integrity of highway infrastructure and be pretty paralyzing to the region.” “If the locks have to close at the opening of a fishing season … it could potentially be a lost season for the fishing industry,” he said. click here to read the story 13:46