Tag Archives: Dredging the Oregon Inlet
VIDEO: Dredging the Oregon Inlet
The U.S. army Corps of Engineers, Wilmington District, started recently dredging operations at the Oregon Inlet in order to remove the shoaling that has been obstructing the federal channel passage for commercial fishing vessels. First on the site was cast dredge Merritt that opened the federal channel at the navigation span of the Bonner Bridge to a controlling depth of 8 feet so the hopper dredge Currituck can work to open the channel to as great a depth as possible up to its authorized depth of 14 feet. Watch the video here 15:04