What a transformation! Before and after photos as Ross Tiger deck works complete

Vital renovation works to the deck of historic trawler Ross Tiger are now complete. The scheme, which started on Monday 5 September, has included removing the rotten timber deck to reveal the steel deck below which was then inspected, grit blasted and painted. Some of the timber was able to be removed for conservation and will return to the museum’s collection. The visual and ultrasound inspections revealed the steelwork to be in much better condition than it could have been, with only minor repairs required. Photos, >click to read< 10:08

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.